性爱综合网,极品黑色丝袜自慰喷水自慰,熟女伦乱,婷婷丁香久久

當(dāng)前位置:首頁-新聞中心新聞中心

的安裝通風(fēng)設(shè)備的必備的事項

發(fā)布人:http://   發(fā)布時間:2017-05-18 15:00:12

任何工程在施工中主要的就是要保證施工的,當(dāng)然也在同時保證施工的質(zhì)量。在通風(fēng)設(shè)備安裝的過程中,尤其是一些高空作業(yè)的時候,我們應(yīng)該要采取一些保護(hù)的措施。下面,我們就一起來看看通風(fēng)設(shè)備安裝的保護(hù)。

In the construction of any project, the most important thing is to ensure the safety of construction, of course, at the same time to ensure the quality of construction. In the installation of ventilation equipment, especially some high-altitude work, we should take some measures to protect the safety. Below, we will take a look at the safety of ventilation equipment installation.

在通風(fēng)設(shè)備安裝施工前要進(jìn)行檢查,如有問題應(yīng)及時處理。如要高空作業(yè),那么應(yīng)系好帶,并且空中不能拋擲物品。作業(yè)現(xiàn)場,應(yīng)配有防護(hù)裝置和消防器材,確保。風(fēng)管吊裝時,其正下方嚴(yán)禁站人。通風(fēng)設(shè)備安裝應(yīng)行試吊,沒有問題后再起吊。

QQ截圖20170428145430.png

Before the installation of ventilation equipment, inspection should be carried out, if any problems should be dealt with in a timely manner. If you want aerial work, you should wear your seat belt and you can't throw objects in the air. Job site should be equipped with safety protection devices and fire protection equipment to ensure safety. The wind pipe lifting, it is prohibited to stand below. The ventilation equipment should be tested first and then hoisted after no problem.

通風(fēng)設(shè)備安裝方法可以根據(jù)現(xiàn)場實際情況來確定,可以進(jìn)行整體吊裝就位,也可以先把風(fēng)管一節(jié)一節(jié)放在支架上,然后逐節(jié)連接。風(fēng)管與防護(hù)套管之間,應(yīng)用柔性材料進(jìn)行封堵。通風(fēng)設(shè)備安裝在進(jìn)行整體吊裝時,通風(fēng)設(shè)備廠要注意先要將風(fēng)管在地面上連接好,其長度為10到12米,不能太長。

Ventilation equipment installation method according to the actual situation of the scene to determine, can be carried out in integral hoisting, can also be a section of a wind tube placed on the frame, and then connected by section. The flexible material is used to seal between the duct and the protective sleeve. Ventilation equipment installed in the overall lifting, ventilation equipment factory should pay attention to the first to connect the wind pipe on the ground, the length of 10 to 12 meters, can not be too long.

通風(fēng)設(shè)備安裝的保護(hù)的內(nèi)容大致就是這樣,要注意的是,風(fēng)管系統(tǒng)全部安裝好以后,通風(fēng)設(shè)備廠要進(jìn)行嚴(yán)密性檢驗,以檢查是否有漏氣現(xiàn)象。只有檢查合格的才能終交付,否則就要進(jìn)行返工。

Ventilation equipment installation of security protection is generally the case, it should be noted that after the installation of all the wind pipe system, ventilation equipment factory to conduct strict inspection to check whether there is a leak phenomenon. Only qualified inspection can be delivered at last, otherwise rework will be done.


上一篇:地下車庫該如何的正確使用通風(fēng)管道
下一篇:車庫排煙口與排風(fēng)口的設(shè)計

網(wǎng)站首頁 關(guān)于我們 產(chǎn)品展示 新聞中心 工程案例 在線留言 聯(lián)系我們