人防地下室平時(shí)和戰(zhàn)時(shí)功能是不同的,按平時(shí)使用功能分主要有地下車庫、地下商業(yè)設(shè)施、庫房等;按戰(zhàn)時(shí)使用功能分有指揮通信工程、醫(yī)療救護(hù)工程、防空隊(duì)工程、人員掩蔽工程和配套工程;

The civil air defense basement has different functions in peacetime and wartime. According to its functions in peacetime, it mainly includes underground garage, underground commercial facilities, warehouse, etc; According to wartime use functions, it is divided into command and communication engineering, medical rescue engineering, air defense professional team engineering, personnel Shelter Engineering and supporting engineering;

因此其通風(fēng)管道的設(shè)計(jì)安裝一定要充分考慮到不同實(shí)際使用情況下的使用;在設(shè)計(jì)初期就將人防和消防同時(shí)考慮,使平時(shí)風(fēng)管、排煙機(jī)房及豎井與戰(zhàn)時(shí)的進(jìn)、排風(fēng)系統(tǒng)、進(jìn)風(fēng)機(jī)房、濾毒室以及戰(zhàn)時(shí)干廁和每個(gè)口部的布置更加合理。

Therefore, the design and installation of the ventilation duct must fully consider the use under different actual use conditions; At the early stage of design, civil air defense and fire protection will be considered at the same time, so as to make the layout of air duct, smoke exhaust machine room and shaft in peacetime more reasonable than that of air inlet and exhaust system, air inlet machine room, poison filter room in wartime, dry toilet and each mouth in wartime.

一般人防通風(fēng)系統(tǒng)中,當(dāng)通風(fēng)管由擴(kuò)散室后墻穿入時(shí),通風(fēng)管端部應(yīng)設(shè)置向下的彎頭。擴(kuò)散室到風(fēng)機(jī)前段風(fēng)管應(yīng)采用鋼管焊接,風(fēng)機(jī)采用軟接頭連接;

In general civil air defense ventilation system, when the ventilation pipe passes through the rear wall of the diffusion chamber, a downward elbow shall be set at the end of the ventilation pipe. The air duct from the diffusion chamber to the front section of the fan shall be welded with steel pipes, and the fan shall be connected with soft joints;

QQ截圖20170428145524.png

同時(shí),氣密性測(cè)量管,壓差測(cè)量管,放射性監(jiān)測(cè)取樣管,尾氣監(jiān)測(cè)取樣管不能遺漏。

At the same time, the air tightness measuring pipe, differential pressure measuring pipe, radioactive monitoring sampling pipe and tail gas monitoring sampling pipe shall not be omitted.

人防通風(fēng)系統(tǒng)在安裝完成后,要按設(shè)計(jì)要求調(diào)整送風(fēng)和回風(fēng)各干支管道、各送回風(fēng)口、空調(diào)機(jī)風(fēng)量;測(cè)定實(shí)測(cè)風(fēng)量并固定風(fēng)閥;所有環(huán)節(jié)全部投入,一般舒適性空調(diào)系統(tǒng)連續(xù)運(yùn)轉(zhuǎn)24小時(shí)以上。

After the installation of the civil air defense ventilation system, the air volume of the air supply and return main and branch pipes, return air outlets and air conditioners shall be adjusted according to the design requirements; Measure the measured air volume and fix the air valve; All links are put into operation, and the general comfort air conditioning system operates continuously for more than 24 hours.

通風(fēng)系統(tǒng)調(diào)試完成后,及時(shí)整理資料并編制報(bào)告,主要內(nèi)容有:

After the commissioning of the ventilation system is completed, the data shall be sorted out in time and the report shall be prepared. The main contents include:

1.電氣、設(shè)備、自控等單體試驗(yàn)

1. electrical, equipment, automatic control and other individual tests

2.測(cè)試、信號(hào)、保護(hù)裝置的調(diào)試數(shù)據(jù)。

2. commissioning data of test, signal and protection devices.

3.系統(tǒng)風(fēng)量調(diào)整結(jié)果。

3. system air volume adjustment results.

以上就是濟(jì)南通風(fēng)管道為大家介紹的內(nèi)容,感謝您在百忙之中查看我公司的信息內(nèi)容,如果您想要了解的更多,歡迎您來電進(jìn)行咨詢! http://

The above is what Jinan ventilation duct introduced to you. Thank you for checking the information of our company in your busy schedule. If you want to know more, you are welcome to call us for consultation! http://


上一篇:暖通工程中通風(fēng)管道的材料以及測(cè)量
下一篇:通風(fēng)管道設(shè)備安裝工程量怎么計(jì)算?

網(wǎng)站首頁 關(guān)于我們 產(chǎn)品展示 新聞中心 工程案例 在線留言 聯(lián)系我們